    Product development

           Our company carries out comprehensive development control according to APQP process, and the development process is divided into the following five steps. After the project is approved, the special project manager will be responsible for customer docking and progress control: 

    1. Design project approval: set up a project team composed of business, project, technology, quality and equipment to conduct project approval;

    2. Conceptual design: design scheme establishment and internal review;

    3. Detailed design: establish product scheme and tooling scheme; Customer approval; Process plan locking;

    4. Design verification: DVP test verifies product scheme, and small-batch trial production verification process scheme;

    5. Design archiving: OTS accreditation and PPAP accreditation, data archiving, design summary and handover to production department.


    ?5 steps are defined as gate1-gate5.

    ? Each step has a corresponding delivery key. All deliverables must be complete and meet the requirements before opening the Gate to enter the next step.

    ? All gates have a clear opening time review.


    Gate 1 設(shè)計(jì)立項(xiàng) 

    Purpose: to specify design input 

    Key: project approval report, design input review form



    Gate 2 概念設(shè)計(jì)

    Objective: to establish the design scheme 

    Key: concept plan, initial parts list, special features summary, DFMEA, test plan, review report



    Gate 3 Detailed design 

    Objective: to lock product plan, tooling plan and process plan 

    Key: design review report, initial sample (RP) review report, tooling 3D data and 2D drawings, process development review report



    Gate 4 Design verification 

    Objective: to verify the product scheme by DVP test 

    Key: problem list, validation report



    Gate 5 Design file 

    Objective: file documents, design summary, transfer to production department 

    Keys: OTS approved, PPAP approved


    Company advantages

    Through years of systematic research and development, the company has developed its own technology path in the fields of advanced EC functional materials, high-performance sealing materials, magnetron sputtering target materials, optical sensor control, optical device design, production process and manufacturing equipment r&d and design, and established a complete technical system, production system and quality system. Through system optimization, high quality and low cost of products are realized.